Visit our on-line store
It is highly appreciate to fill this form accordingly so that we can work out the best solution for your hydro project. The more detail data you provide the more exactly offer we can supply.
Please tell us about your project.
Thank you for your interest in ELECTWAY Hydro. Since every aspect of a turbine system depends on knowing HEAD and FLOW, we'll need this information about your project to answer even the basic questions (including rough cost estimates).
Name*
|
|
Email*
|
|
Address
|
|
Telephone
|
|
City
|
|
State/Province
|
|
HEAD Measurement (required)
Please specify Gross (static) HEAD measurement as vertical distance OR pressure.
Vertical Distance
|
Feet:
Meters:
|
- OR -
Pressure
|
Pounds per square inch:
Newtons per square centimeter:
|
FLOW Measurement (required)
Please specify FLOW measurement.
Quantity
|
Cubic Meters
|
per Second:
|
Other Site Information (Optional)
Please enter the following information and include your unit of measurement (feet, inches, centimeters, meters).
Surface area of pond behind dam:
|
|
Is the dam built?
|
Yes /No
|
Electrical Requirements (Optional)
ELECTWAY Hydro offers stand-alone systems to operate independently of the utility grid, as well as "grid interface" systems designed to synchronize and sell power to the electrical company. Please specify the type of system you wish to install:
Will the system be connected to the Utility Grid?
|
|
Voltage required:
|
|
Length of transmission line:
|
|
Name of Utility Company (if any):
|
|
Other Comments: