Hydro power project in Pakistan

Hydro power project in Pakistan

· Rated Discharge = 600  m3/s   

· Rated Head  = 2.62 m   

· Installed Capacity = 14.09 MW

· Annual Energy = 38.34 GWh 

· No. of Units = 4 (Horizontal shaft double regulated Kaplan pit turbine)

· Base Cost = US$ 50.17 Million 

· EIRR (%) = 12.84

· FIRR (%) =Public=9.17 

· Levelized Tariff (US Cents/kWh) = Public=13.78 

· Probability of Occurrence(%) =26     

· Plant Factor (%) = 31.06

· Access to Site = Through Gujrat-Shadiwal road through RMB of Khanki Headworks 

· Transmission Line = 22 km long 33 kV line will connect to 132 kV Wazirabad, nearest Grid Station

Hits:  UpdateTime:2012-12-15 11:25:07  【Printing】  【Close